Map

Accessibility
Prime location with multimodal connectivity
Moveo Park offers excellent road, rail and air accessibility, making it ideal for industrial and logistics operations.

Road access
- 8 minutes to M30 motorway
- Direct connection to Hungary’s main transport network
- 15 minutes from Miskolc city center

Rail potential
Possibility to restore the former industrial railway connection, enabling large-scale logistics via the nearby station.

Air connectivity
International airports within reach:
- Budapest (Liszt Ferenc)
- Debrecen
- Košice
Travel time: 70–110 minutes
Utilities capacity
Modern, fully equipped infrastructure tailored to all needs
The park benefits from a full utility network, providing a reliable foundation for seamless industrial operations.
Electricity
22 kV / 5 MW, a further 25MW capacity is under development, scheduled for completion January 31, 2027
Gas
600 m³/hour
Call to action
Interested in a site visit?
We are happy to show you the available development areas in person.
info@acelmax.hu
+36 30 664 2318
3791 Sajókeresztúr, Rákóczi utca 107